Work packages and deliverables

compared with
Key
This line was removed.
This word was removed. This word was added.
This line was added.

Changes (6)

View Page History



|| Id || Name || Type || Status ||
| D1.1.1 | [Requirements of the project|^D1-1-1_Requirements_v0.9.pdf] | Document | (/) (T0+15) |



|| Id || Name || Type || Status ||
| D2.1.1 | [Social Service Modelling |^D2.1.1 Social Service Modeling.pdf] | Document | (/) (T0+9) |
| D2.1.2 | [Social-aware Event Modelling and Matching|^D2-1-2_Social_Event_Matching_04.pdf] | Document | (/) (T0+18) |
| D2.2.1 | [Esper Engine versus requirements|^SocEDA D2.2.1 EsperEngine.pdf] | Document | (/) (T0+18) |
| D2.2.2 | A [A POC to illustrate Esper engine|soceda:UC3 - Missed Calls] | Implementation | _pending (T0+24)_ (/) (T0+24) |
| D2.2.3 | [Identification of requirements to support distributed CEP|^D2.2.3-Identification of requirements to support distributed CEP.pdf] | Document | (/) (T0+18) |
| D2.2.4 | SocEDA distributed CEP engine | Specification and Prototype | _pending (T0+36)_ |



|| Id || Name || Type || Status ||
| D3.1.1 | [Specification of the event-based monitoring framework V1|^D3.1.1–Specification_of_the_event-based_monitoring_framework_v1.pdf] | Document | (/) (T0+15) |



|| Id || Name || Type || Status ||
| D4.1.1 | [Relevant SOTA in CEP system|^D4.1.1 Relevant state of the art in Esper CEP system.pdf] | Document | (/) (T0+9) |



|| Id || Name || Type || Status ||
| D5.1.1 | [Integrated SocEDA documentation(fr)|^D5.1.1 SocEDA-delivrablesT018.dot.pdf]\\